While overhauling the Schaublin 13, some o-rings are to be replaced. The original plans show a cryptic reference for the parts. We found how they relate to o-ring sizes.
The Schaubling 13 oil level sight glass should be replaced because the original one was chipped off after pulling it out. Which materials and how to mark it?
The SV13 is clean and painted. All the mechanical issues have benn solved. Now it’s time to reassemble it.
Here I face to recover the original aspect of the Schaublin 13. I will try to preserve original colors and distributions and, to some extent, the original coating where possible.
This post explains the disassembly of the milling machine knee together with the mechanisms related to the automatic traverse feeds. This includes the assembly that drives the traverses from the main motor.
The last post discovered the Y axis ram problems. In this post I explain how the aligment problems were (partially) solved. This is the result of a long journey through geometry and aligment testing, scraping learning and lots of patience.