This post contains the notes describing the complete refurbishment process of the Schaublin 13 milling machine.

Schaublin 13: Reeves drive

Schaublin 13: Reeves drive

In this post I show the maintenance of the Schaublin 13 Reeves drive. Together with the main …

Schaublin 13: feed gearbox

Schaublin 13: feed gearbox

In this post I talk about the maintenance of the Schaublin 13 table feed gearbox. It is easy to …

Schaublin 13: ram testing

Schaublin 13: ram testing

The first tests done when machine arrived at the workshop discovered an issue on the geometry of the …

Schaublin 13: ram refurbish

Schaublin 13: ram refurbish

The last post discovered the Y axis ram problems. In this post I explain how the aligment problems …

Schaublin 13: knee

Schaublin 13: knee

This post explains the disassembly of the milling machine knee together with the mechanisms related …

Schaublin 13: renew coating

Schaublin 13: renew coating

Here I face to recover the original aspect of the Schaublin 13. I will try to preserve original …

Schaublin 13: assemble

Schaublin 13: assemble

The SV13 is clean and painted. All the mechanical issues have benn solved. Now it’s time to …

Schaublin 13: junction box

Schaublin 13: junction box

In the way of renovate the Schaublin 13, it is time to manage the lamp support and its connection. …

Schaublin 13: gearbox noise

Schaublin 13: gearbox noise

By some reason I thought since the begining of the overhauling that the gearbox was in a nice …